Cardinal Hume Catholic School chapel roof stripped off and recovered this week. The original rooflights were removed and boarded over as these were a constant problem area for the school. Also the old roof was stripped down to the existing deck, upon doing so we discovered whoever did the original roof had not fitted a Vapour control layer which will have caused numerous problems over the years. We then fitted a new VCL, flat board insulation and single ply membrane, all guaranteed for the next 20 years.
AJM Projects LTD delivers clean, durable single-ply membrane roofing that outperforms traditional felt. Professional. Efficient. Zero frills.







